Torrens Road to River Torrens Extension Project

    SCOPE OF WORK

    CME Civil were awarded several packages as part of the T2T Extension Projects:

    Lowered motorway works – Construction of new pressure fire main in lowered motorway including valve assemblies etc. (approx. 5000m of 100/150mm dia. PVC-M PN16 pressure pipe) and construction of all stormwater drainage and subsoil drains in the new lowered motorway road section.

    Water main connections / relocations – including tie ins to & decommissioning existing main under weekend and night shut down conditions. Works involved co-ordination with SA Water personnel to ensure minimal interruption to critical infrastructure in major south road carriageway.

    Trunk and Branch Sewer Construction works – The construction of various SA Water sewer works infrastructure between Scotia St and Pym St – Large diameter trunk gravity sewer (525/600mm) mains, network of manholes plus all connections and link-in / cutover works into existing infrastructure under high flow conditions.

    Sewer Packages 2 & 3 – consisted of the construction of two SA Water spec wastewater pump station (DN1800 & DN2200 precast chambers installed at approx. 8m deep each) on the corner of Grange & South Road and the corner of Robert St & South Road including all associated gravity and pumping mains including all connections and tie ins (approx. 1800m of Pipelaying – 100,150,225 & 300mm PVC).

    CLIENT
    T2T Alliance – CPB York Venture

    LOCATION
    South Road, SA

    PROJECT VALUE
    $6 Million

    CONSTRUCTION PERIOD
    November 2015 – September 2018