Works included the installation, testing and commissioning of M1 and M6A underground raw water pipeline which connects the Borefields north of Marree with the principal’s desalination plant at Olympic Dam.
The pipelines were constructed with 508mm and 648 mm OD MSCL pipe, with a combination of RRJ Socket End/Sintajoint Spigot End & RJJ Spigot End/Sintajoint Socket End
CLIENT